IYS PUR 450
Product Information
ÜRÜN TANIMI
BZ PUR 450, iki komponentli hızlı kürlenen sürme esaslı hibrid poliüre sistemidir. Rulo veya mala Ile yapılan uygulamalar için özel olarak geliştirilmiştir. Mükemmel bir elastikiyete sahiptir,ayrıca yapışmayı güçlendirmek amacıyla özel olarak formüle edilmiş polimerize bir profile sahiptir. Yüksek seviyede aşınma direnci ve darbe mukavemeti gerektiren ticari ve endüstriyel uygulamalar için ideal bir üründür.
KULANIM YERLERİ
▪ Teraslar
▪ Balkonlar,
▪ Köprüler ve Tüneller,
▪ Islak hacimler,
▪ Zeminler,
▪ Kaplama altı alanlar,
▪ Betonarme yapılar.
Product Description
ADVANTAGES
- Provides fast curing.
- Easy to apply.
- Does not contain plastic materials.
- Free from toxic catalysts made of heavy metals.
- Excellent thermal resistance.
- The product will never soften again.
- Resistant to cold.
- The film retains its elasticity even at -40°C.
- Excellent mechanical properties, with high tensile and tear strength.
- High abrasion resistance.
- Good chemical resistance.
- Effective in moisture vapor transmission.
- The film is breathable, preventing moisture buildup beneath the film layer.
APPLICATION INFORMATION
Surface Information:
- The application surface must be solid. The surface should have a minimum compressive strength of 25 N/mm² and a minimum pull-off test result of 1.5 N/mm². New concrete must be at least 28 days old, and concrete surfaces should have a moisture content of no more than 5-6%. All loose, movable particles, oil and paint residues, and cement slurry must be removed. Large cracks and defects should be repaired beforehand.
- Concrete surfaces with cement crusts and smooth screeds should be cleaned and roughened using tools such as sandblasting, notch machines, diamond drum scrubbers, or mechanical grinders. The surface should then be wiped. The entire surface should be dust-free using an industrial vacuum cleaner.
- The relative humidity of the air should not exceed 80%, and the application temperature (ambient and surface) should be between +5°C and +35°C. The area should be free from rain 24 hours before application, during application, and 24 hours after application. The surface temperature should be at least 3°C above the dew point.
Preparing the Mixture:
- As a two-component product, the mixture should be prepared in the specified ratio, considering the usage amount. Ensure the product temperature is at least 15°C for homogeneous mixing. Component A should be quickly mixed with a mechanical mixer, and the hardener (Component B) should be added following the correct mixture ratio. Mix both components with a mechanical mixer until they become homogeneous.
Application on Surface:
- The prepared mixture should be applied with a roller or trowel to saturate the surface and close the pores. The minimum time between coats is 8 hours (at 20°C), and the maximum is 1 day. It is crucial to apply the second coat within this time frame.
Consumption:
- Minimum consumption: 1.5-2 kg/m²
PACKAGING INFORMATION:
- Component A: 8 kg
- Component B: 4 kg
- Total: 12 kg per set
STORAGE INFORMATION:
- Store the material in a cool, dry place. The shelf life of the unopened original packaging for both components is 1 year.
TECHNICAL DATA SHEET